Contents
1.1 Purpose of the Report
1.2 Structure of the Report
2.1 Background
2.2 General Site Description
2.3 Construction Activities
2.4 Project Organisation and
Management Structure
2.5 Status of Environmental
Approval Documents
3 Environmental Monitoring Requirement, environmental
Mitigation Measures
4 Implementation Status on Environmental Protection
Requirements
6.1 Weekly Site Audits
6.2 Landscape and Visual Audit
7 Environmental Non-conformance
7.1 Summary of Environmental
Non-Compliance
7.2 Summary of Environmental
Complaint
7.3 Summary of Environmental
Summon and Successful Prosecution
8.1 Key Issues for the Coming
Month
8.2 Construction Programme
LIST OF TABLES
Table 2.1 Summary of Construction Activities
Undertaken in the Reporting Period
Table 2.2 Summary
of Environmental Licensing, Notification and Permit Status
Table 5.1 Quantities
of Waste Generated from the Project
Table 8.1 Construction
Works to be undertaken in the Next Reporting Period
LIST OF ANNEXES
Annex A |
|
Annex B |
|
Annex C |
|
Annex D |
|
Annex E |
|
Annex F |
|
Annex G |
Environmental
complaint, Environmental Summons and Prosecution Log |
|
|
EXECUTIVE SUMMARY
The construction works of No. EP/SP/61/10 Organic Waste
Treatment Facilities Phase I (the Project) commenced
on 21 May 2015. This is the 9th
monthly Environmental Monitoring and Audit (EM&A) report presenting the
EM&A works carried out during the period from 1 February 2016
to 29 February 2016 in accordance with the EM&A Manual.
Summary of Construction Works undertaken during the Reporting
Month
Works undertaken in the reporting month included:
·
Excavation, Earthling
Installation and Concrete Footing Works for Building 1;
·
Construction and
Superstructure Works for Building 2;
·
Construction, Superstructure
and Sheet Pile Extraction Works for AD Tank;
·
Construction Works for
Boundary Wall; and
·
Excavation Works for Biogas
Holder Area.
Environmental Monitoring and Audit Progress
A summary of the monitoring activities undertaken in
this reporting period is listed below:
·
Joint Environmental Site Inspection |
4 times |
·
Landscape & Visual Monitoring |
2 times |
Waste Management
Waste generated from this Project includes inert
construction and demolition (C&D) materials (public fill) and non-inert
C&D materials (construction wastes).
Inert C&D materials (public fill) include bricks,
concrete, building debris, rubble and excavated spoil. In total, 4,166.42 tonnes of inert C&D
material were generated from the Project, of which 0.00 tonnes were reused in
this Contract. The 4,166.42 tonnes of
inert C&D material were disposed of as public fill to the Fill Banks at Tuen Mun Area 38 and Tseung Kwan O Area 137.
Non-inert C&D materials (construction wastes)
include metals, paper / cardboard packaging waste, plastics and other wastes
such as general refuse. 510.00 kg of
metals, 79.00 kg of papers/ cardboard packing and 0.00 kg of plastics were sent
to recyclers for recycling during the reporting period. 16.57 tonnes of general refuse was disposed as
landfill.
0 L of chemical waste was collected by licenced waste
collector and sent to West New Territories (WENT) Landfill.
Environmental Site Inspection
Four weekly joint environmental site inspections were
carried out by the representatives of the Contractor, SOR and the Environmental
Team (ET). The IEC was also present at the joint inspection on 17 February 2016. Details of the
audit findings and implementation status of the mitigation measures are
presented in Section 6.1.
Landscape & Visual
Onsite inspections on landscape and visual
mitigation measures were performed on 12 and 26 February 2016. Details of the audit findings and
implementation status of the mitigation measures are presented in Sections 6.2.
Environmental
Exceedance/Non-conformance/Compliant/Summons and Prosecution
No exceedance
was recorded during the reporting period.
No
non-compliance event was recorded during the reporting period.
No environmental complaint and summon/prosecution was
received in this reporting period.
Future Key Issues
Works to be undertaken in the next reporting month
include:
·
Construction and Raft
Foundation Works for Building 1;
·
Construction and
Superstructure Works for Building 2;
·
Excavation Works for
Building 3;
·
Installation Works for AD
Tank;
·
Construction Works for
Boundary Wall and Boundary Fence Wall;
·
Construction Works for
second Site Access;
·
Construction Works for
Boundary Wall;
·
Construction Works for
Site-wise Drainage and
·
Earthling Installation
Works.
Environmental impacts arising from the above
construction activities are mainly associated with dust, construction noise,
site runoffs, waste management and landscaping issues.
ERM-Hong Kong, Limited (ERM) was appointed by OSCAR
Bioenergy Joint Venture (the Contractor) as the Environmental Team (ET) to
undertake the Environmental Monitoring and Audit (EM&A) programme for the Contract
No. EP/SP/61/10 of Organic Waste Treatment Facilities Phase I
(the Project).
This is the 9th EM&A report which summarises
the monitoring results and audit findings for the EM&A programme during the
reporting period from 1 to 29 February 2016.
The structure of the report is as follows:
Section 1: Introduction
It details the
scope and structure of the report.
Section 2: Project
Information
It summarises the background and scope of the Project, site description,
project organization, construction programme, construction works undertaken and
status of the Environmental Permits (EP)/licences over the construction phase
of the Project.
Section 3: Environmental Monitoring Requirements
It
summarises the environmental monitoring requirements including monitoring
parameters, programmes, methodologies, frequency, locations, Action and Limit
Levels, Event/Action Plans, environmental mitigation measures as recommended in
the EM&A Manual and approved EIA report.
Section 4: Implementation
Status on Environmental Mitigation Measures
It
summarises the implementation of environmental protection measures during the
reporting period.
Section 5: Waste
Management
It
summarises the quantity of public fill and construction waste generated in the
reporting period
Section 6: Environmental
Site Inspection
It
summarises the audit findings of the weekly site inspections undertaken within
the reporting period.
Section 7: Environmental
Non-conformance
It
summarises any exceedance of environmental performance standard, environmental
complaints and summons received within the reporting period.
Section
8: Further Key Issues
It
summarises the impact forecast and monitoring schedule for the next reporting
month.
Section
9: Conclusions
The
Organic Waste Treatment Facilities (OWTF) Phase I development (hereinafter
referred to as “the Project”) is to design, construct and operate a biological
treatment facility with a capacity of about 200 tonnes per day and convert
source-separated organic waste from commercial and industrial sectors (mostly
food waste) into compost and biogas through proven biological treatment
technologies.
The environmental acceptability of the construction and operation
of the Project had been confirmed by findings of the associated Environmental
Impact Assessment (EIA) Study completed in 2009. The Director of Environmental Protection
approved this EIA Report under the Environmental Impact Assessment Ordinance
(EIAO) (Cap. 499) in February 2010 (Register No.: AEIAR-149/2010)
(hereafter referred to as the approved EIA Report). Subsequent Report on Re-assessment on
Environmental Implications and Report on Re-assessment on Hazard to Life
Implications were completed in 2013, respectively.
An Environmental Permit (EP) (No. EP-395/2010)
was issued by the Environmental Protection Department (EPD) to the EPD, the
Permit Holder, on 21 June 2010 and varied on 18 March 2013 (No. EP-395/2010/A)
and 21 May 2013 (No. EP-395/2010/B), respectively. The Design Build and Operate Contract for the
OWTF (Contract No. EP/SP/61/10 Organic Waste Treatment Facilities Phase I (the
Contract)) was awarded to SITA Waste Services Limited, ATAL Engineering Limited
and Ros-Roca, Sociedad Anonima jointly trading as the OSCAR Bioenergy Joint
Venture (OSCAR or the Contractor). A Further EP (No. FEP-01/395/2010/B) was
issued by the EPD to the OSCAR on 16 February 2015. Variation to both EPs No.
EP-395/2010/B and No. FEP-01/395/2010/B were made in December 2015.
The latest EPs, No. EP-395/2010/C and No. FEP-01/395/2010/C,
were issued by the EPD on 21 December 2015.
Under the requirements of Condition 5 of the EP (No.
FEP-01/395/2010/C), an Environmental Monitoring and Audit (EM&A) programme
as set out in the Agreement No. CE7/2008 (EP) EM&A Manual (hereinafter
referred to as EM&A Manual) is required to be implemented. ERM-Hong Kong, Ltd (ERM) has been appointed
by OSCAR as the Environmental Team (ET) to undertake the EM&A programme for the Contract.
The construction works commenced on 21 May 2015 and
are scheduled for completion by April 2017.
The
Project Site is located at Siu Ho Wan in North Lantau with an area of about 2
hectares. The layout of
the Project Site is illustrated in Annex A.
A summary of the major construction
activities undertaken in the reporting period is shown in Table 2.1. The locations of the construction activities
are shown in Annex
B. The construction programme of the Project is
presented in Annex
C.
Table 2.1 Summary of Construction Activities
Undertaken in the Reporting Period
Construction Activities
Undertaken |
·
Excavation,
Earthling Installation and Concrete Footing Works for Building 1; ·
Construction
and Superstructure Works for Building 2; ·
Construction,
Superstructure and Sheet Pile Extraction Works for AD Tank; ·
Construction
Works for Boundary Wall; and ·
Excavation
Works for Biogas Holder Area. |
The project organisation chart and contact details are
shown in Annex D.
A summary of the valid permits, licences, and/or
notifications on environmental protection for this Project is presented in Table 2.2.
Table 2.2 Summary of Environmental Licensing,
Notification and Permit Status
Permit/ Licences/ Notification |
Reference |
Validity Period |
Remarks |
Environmental Permit |
FEP-01/395/2010/C |
Throughout the Contract |
Permit granted on 21 December
2015 |
Notification of Construction
Works under the Air Pollution Control (Construction Dust) Regulation |
Ref No. 386715 |
Throughout the Contract |
- |
Effluent Discharge License |
WT00021482-2015 |
21 May 2015 – 31 May 2020 |
Approved on 21 May 2015 |
Construction Noise Permit |
GW-RW0001-16 |
15 January 2016 – 14 July 2016 |
Permit granted on 4 January
2016 |
Chemical Waste Producer
Registration |
WPN 5213-961-O2231-01 |
Throughout the Contract |
Approved on 29 April 2015 |
Waste Disposal Billing Account |
Account number: 702310 |
Throughout the Contract |
- |
All
the relevant environmental mitigation measures listed in the EIA Report and
EM&A Manual are summarised in Annex E.
According to the EM&A Manual and EP requirement,
no air quality, noise and water quality monitoring is required.
Bi-weekly landscape and visual audit is required to ensure that the design,
implementation and maintenance of landscape and visual mitigation measures
recommended in the EIA Report are fully achieved.
The Contractor has implemented environmental
mitigation measures and requirements as stated in the approved EIA Report and
EM&A Manual. The implementation
status of the measures during the reporting period is summarised in Annex E.
Wastes generated from this Project include inert
construction and demolition (C&D) materials (public fill) and non-inert
C&D materials (construction waste). Construction
waste comprises general refuse, metals and paper/cardboard packaging
materials. Metals generated from the Project
are also grouped into construction waste as the materials were not disposed of
with others at public fill. Reference
has been made to the Monthly Summary Waste Flow Table prepared by the
Contractor (see Annex F). With reference to the relevant handling
records and trip tickets of this Project, the quantities of different types of waste
generated in the reporting month are summarised in Table 5.1.
Table 5.1 Quantities
of Waste Generated from the Project
Month / Year |
Quantity |
|||
|
Total Inert C&D Materials Generated (a) |
Non-inert C&D Materials (b) |
||
C&D Materials Recycled (c) |
C&D Waste Disposed of at Landfill (d) |
Chemical Waste |
||
February 2016 |
4,166.42 tonnes |
589.00 kg |
16.57 tonnes |
0 L |
Notes: (a) Inert
C&D materials (public fill) include bricks, concrete, building debris,
rubble and excavated spoil. In total, 4,166.42 tonnes
of inert C&D material were generated from the Project, of which 0.00 tonnes
were reused in this Contract and the 4,166.42 tonnes
were disposed as public fill to Fill Banks at Tuen Mun Area 38 and Tseung Kwan O
Area 137. The detailed waste flow is presented in Annex F. (b) Non-inert
C&D materials (construction wastes) include metals, paper / cardboard
packaging waste, plastics and other wastes such as general refuse. Metals generated from the Project were grouped
into construction wastes as the materials were not disposed of with others at
the public fill. (c) 510.00 kg
of metals, 79.00 kg of papers/ cardboard packing and 0.00 kg of
plastics were sent to recyclers for recycling during the
reporting period. (d) Construction wastes other than
metals, paper/cardboard packaging, plastics and chemicals were disposed of at
NENT Landfill by subcontractors. |
Joint site inspections were conducted by representatives of the
Contractor, the ER, IC and the ET on 5, 12, 17 and 26 February 2016. The IEC was also
present at the joint inspection on 17 February 2016. Follow-up actions resulting
from the last site inspections were taken as reported by the Contractor and
their results were observed in the site inspections conducted in the reporting
period.
Key observations
during the reporting period are summarised as follows:
5 February 2016
No observation was found.
12 February 2016
· Oil patch was observed on ground near the wastewater treatment
tank. It was recommended to enclose and
label the contaminated soil for collection by the licensed collector.
17 February 2016
· Several empty chemical containers were found on bare ground near the
wastewater treatment facility. The
contractor was advised to ensure proper storage of the chemical waste or remove
them for chemical waste disposal.
· Chemical waste stored in the chemical waste storage
area were found to be without chemical waste label. The contractor was reminded to provide
corresponding chemical waste label to them.
26 February 2016
No observation was found.
In accordance with the EM&A Manual, bi-weekly landscape and
visual inspection is required to
ensure that the design, implementation and maintenance of landscape and visual
mitigation measures recommended in the EIA Report are fully achieved. Onsite inspections of the landscape and
visual mitigation measures were performed on 12 and 26 February 2016.
Follow-up actions resulting from the last site inspections were taken as
reported by the Contractor and their results were observed in the site
inspections conducted in the reporting period.
It was confirmed that the necessary landscape and visual mitigation measures as summarised in Annex E were generally implemented by the Contractor. No specific observation was found during site
inspection on 12 and 26 February 2016.
No non-compliance event was recorded during the
reporting period.
No complaint was received during the reporting
period. The cumulative environmental
complaint log is shown in Annex G.
No summon/prosecution was received during the
reporting period. The cumulative
summons/prosecution log is shown in Annex G.
Works to be undertaken for the coming monitoring
period are summarised in Table 8.1.
Table 8.1 Construction
Works to be undertaken in the Next Reporting Period
Construction Activities
Undertaken |
|
·
Construction
and Raft Foundation Works for Building 1; ·
Construction
and Superstructure Works for Building 2; ·
Excavation
Works for Building 3; ·
Installation
Works for AD Tank; ·
Construction Works for Boundary Wall and Boundary
Fence Wall; ·
Construction Works for second Site Access; ·
Construction
Works for Boundary Wall; ·
Construction
Works for Site-wise Drainage and ·
Earthling
Installation Works. |
Potential environmental impacts arising from the above
construction activities will be mainly associated with dust, construction
noise, site runoffs, waste management and landscaping issues.
The most up-to-date construction programme for the
Project is presented in Annex C.
This EM&A Report presents the EM&A programme undertaken
during the reporting period from 1 February 2016 to 29 February 2016 in
accordance with EM&A Manual and requirements of EP (FEP-01/395/2010/C).
No air quality, noise and water quality monitoring is
required.
Bi-weekly landscape and visual monitoring was
conducted in the reporting period. The
necessary landscape and visual mitigation measures recommended in the EIA
Report were generally implemented by the Contractor.
No non-compliance event was recorded during the
reporting period.
No complaint and summons/prosecution was received
during the reporting period.
The ET will keep track of the EM&A programme to
ensure compliance of environmental requirements and the proper implementation
of all the necessary mitigation measures in the coming periods.